
Ely, Minnesota
Ely Public Library
Project
Summary
Meyer Group worked closely with the City of Ely, the City Council, and JPJ Engineering on the brand new, state-of-the-art, public library. Meyer Group was hired by JPJ Engineering of Hibbing, MN to develop a concept for the new stand-alone facility. Located across the street from the historic Ely City Hall, the Library design included a children’s area, cozy seating nooks, private study rooms, and a public meeting space. Additional considerations include the selection of maintenance free sustainable building materials, the desire for natural light, patron comfort, and security and pedestrian access.
Services
Architecture, Interior Design
The Build
Construction Manager – As Agent Delivery Format – Wood frame construction
Completion
2015
Size & Cost
6,000 S.F.
$1.4 Million



Have a question about how we work or just want to drop us a line?
